000 01344nam a2200205Ia 4500
999 _c2948
_d2948
003 OSt
005 20200301114845.0
008 140801s2012 xx 000 0 und d
020 _a9789380358536
082 _a627.2 SRI-H
100 _aSrinivasan, R
245 _aHarbour Dock and Tunnel Engineering
250 _a25th
260 _bCharator Pub
_c2012
_aGujarat
300 _a407p.
500 _a. Harbours and Ports 2. Natural Phenomena : Tides Wind and Waves 3. Protection Facilities : Mound Breakwater 4. Protection Facilities : Wall Type and Special Breakwaters' 5. Planning and Layout of Ports 6. Docking Facilities 7. Repairing Facilities 8. Approach Facilities 9. Loading Unloading Facilities 10. Storing Facilities 11. Dredging Facilities 12. Guiding Facilities 13. General Aspects 14. Stages in Tunnel Construction 15. Soil Classification and Tunnelling Methods 16. Other Methods of Tunnelling in Soft Soils 17. Tunnelling in Water Bearing Soils 18. Tunnelling in Rock 19. The New Austrain Tunnelling Methods(NATM) 20. Shafts 21.Tunnel Lining 22. Drainage of Tunnels 23. Tunnel Ventilation, Dust Prevention and Lighting 24. Health Protection in Tunnels
650 _aNatural Phenomena : Tides Wind and Waves, Planning and Layout of Ports , Docking Facilities
700 _aR Srinivasan
942 _2ddc
_cBK