Item type | Current library | Collection | Call number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|
Reference Book | Amity Central Library ABS | Reference | 658.50723 KRI-C (Browse shelf(Opens below)) | Not For Loan | 11943 | ||
Books | Amity Central Library ABS | 658.50723 KRI-C (Browse shelf(Opens below)) | Available | 11944 | |||
Books | Amity Central Library ABS | 658.50723 KRI-C (Browse shelf(Opens below)) | Checked out | 27/04/2016 | 11945 | ||
Books | Amity Central Library ABS | 658.50723 KRI-C (Browse shelf(Opens below)) | Available | 11946 | |||
Books | Amity Central Library ABS | 658.50723 KRI-C (Browse shelf(Opens below)) | Available | 11947 |
Browsing Amity Central Library shelves, Shelving location: ABS, Collection: Reference Close shelf browser (Hides shelf browser)
No cover image available | ||||||||
658.5 PAN-P PRODUCTION & OPERATION MANAGEMENT | 658.5 PAN-P Production & Operations Management | 658.50182 LEV-T Transparency masters to accompany SPC essentials and productivity improvement : a manufacturing approach | 658.50723 KRI-C CASES IN OPERATIONS MANAGEMENT | 658.50723 KRI-C Cases in Production / Operations Management | 658.514 KHA-M Management of technology | 658.515 PAN-F Four Facts of Business Efficiency |
PART I FACILITIES AND CAPACITY
Case 1 HIMAT Tool Room
Case 2 Machine Utilization at Krishnan & Co.
Case 3 Evaluation of Production Programme in Bhal Tools
Case 4 Development of INDUS Plant Layout
Case 5 Capacity Planning for Manufacturing in WPSDL
PART II MATERIALS MANAGEMENT
Case 6 Magi Corporation
Case 7 Material Control at HYPO
Case 8 Integrated Materials Management in Moti Engineering Works
Case 9 Spare Parts Inventory Management at BMO
Case 10 Purchase Control at Kalpavruksha Silk Company
PART III MANPOWER MANAGEMENT
Case 11 Manpower Planning at Mylin
Case 12 Beamtronics—Assembly Manpower
Case 13 Mangalore Fibres Limited
Case 14 Tool Room Standards at Abhyagat
Case 15 Planning Tours of a Marketing Executive at BLPB
PART IV PRODUCTION PLANNING AND SCHEDULING
Case 16 Scheduling at Bellop
Case 17 Planning and Scheduling of Multiproducts at Beamtronics
Case 18 Dazzle Lamp—Aggregate Production Planning
Case 19 Utilization of Resources at MECAST Foundry
Case 20 Scheduling of Heat-treatment Furnace of Sagar Foundry
PART V PRODUCTION/OPERATIONS CONTROL
Case 21 Oskar Manufacturing Corporation
Case 22 KIRA—Production Control System Design
Case 23 Quality Control in BECO
Case 24 Control of Yenka Runway Project
Case 25 Operating Decisions in Iravatha Silk Manufacturing
Case 26 Strategic Issues of Production Control at MMTL
PART VI LOGISTICS/DISTRIBUTION PLANNING
Case 27 Efficient Milk Collection for Vandana Dairy
Case 28 Collection of Solid Waste at Purangam
Case 29 Campus Mail Service
Case 30 Inventory and Distribution Planning for Jala Raksha Ltd.
Case 31 Solid Waste Handling at MIC
There are no comments on this title.